Welcome to Beijing Bangxuan Mosaic!

13716334909

Call us anytime

13716334909

Send Email

2199206852@qq.com

Mosaic construction technical guidance

  First, wall surface preparation

  Apply a layer of adhesive about two millimeters thick while the wall is smooth, dry and clean.

  Second, paste preparation

  Equal Mosaic lines are drawn on the surface of the wall to prepare for fixing the equal Mosaic position.

  Three, paste

  Use a trowel to evenly apply the adhesive to the wall no more than one square meter at a time, put the paper face down, remove the broken, cracked, or damaged mosaics, and then pick up the whole Mosaic, put the other side of the paper face outward in the direction indicated by the arrow on the wall, and then gently press the surface with a rubber block to make sure it is completely affixed, after 5-10 minutes, wet the paper with water and gently tear it off. If you find that there are still problems with the Mosaic, gently pry down with a knife, replace with a good Mosaic, there are irregular places with a blade gently adjusted, before the surface dry with a scraper or rag to remove excess sticky.

  Fourth, caulking agent

  Special care with caulk, make sure the surface is clean first, then apply the caulk with a wooden board, no more than two square meters at a time, and let it dry slowly.

  5. Cleaning

  Gently wipe off excess caulk with a damp cotton cloth.

  6. Cut off excess mosaics

  For small pieces, you can remove them with tweezers;

  For the whole bar or block can be cut with a knife.

  Seven, maintenance

  Daily care, with neutral washing solution can be, special care, to use alkaline washing solution.

  Note: It is recommended to use special Mosaic adhesive and caulk for auxiliary materials to ensure adhesive strength and beautiful surface, and to facilitate maintenance.


Leave a Message